he waste heat recovery and utilization project of coke oven gas riser in Hubei Zhongping Egang Unite

Date: 2019-02-26
Views: 30

The waste heat recovery system for raw gas in the risers of the 2×55-hole 6-meter top-charging coke ovens in the East Area of the Steel Coking Plant started the installation and debugging phase in early May 2018. By November 22, all 110 holes were put into normal operation. Currently, the system is running stably, and the steam output far exceeds the design expectation. The average working pressure of the steam drum is 1.5-1.8 MPa (design pressure: 2.5 MPa), and the saturated steam output of the system reaches more than 18 T/h, achieving an improvement in the steam grade from the heat recovery of raw gas. The steam production pressure can reach 2.5 MPa, and the heat recovered per ton of coke is much higher than that of coke oven waste heat recovery in the same industry. 

In the early stage of system installation, due to the misoperation of thermal insulation workers, one riser ruptured. It has now been repaired and has been running stably for more than two months。

湖北中平鄂钢联合焦化有限责任公司 焦炉煤气上升管余热回收利用项目运行平稳

湖北中平鄂钢联合焦化有限责任公司 焦炉煤气上升管余热回收利用项目运行平稳

Related recommend / Hot News
2019 - 03 - 11
Hit count: 117
On the occasion of the Lunar New Year, the 18 million kcal steam-heated heat transfer oil system project undertaken by our company for the main factory of Huafang Co., Ltd. was successfully put into o...
2019 - 02 - 26
Hit count: 134
From November 14th to 16th, leaders from Hyundai Steel Co., Ltd. of South Korea paid a 3-day visit to our company. Liu Xiaoping, Chairman of the Board, Dong Renhe, Deputy General Manager, Li Juxiang, ...
2019 - 02 - 26
Hit count: 50
From October 25 to November 11, Jiangning Binjiang Development Zone held the first 2018 Games at the Olympic College of Nanjing Sport Institute. Seven athletes from our company participated in five ev...
2019 - 02 - 26
Hit count: 95
At the end of July this year, the project "R&D and Industrialization of High-Efficiency and High-Grade Waste Heat Recovery Device for Raw Gas in Coke Oven Ascending Pipes", which our com...
Online message
Follow us
Contact us
  • Name
  • *
  • Company:
  • *
  • Address:
  • *
  • Telephone
  • *
  • Fax:
  • *
  • E-mail
  • *
  • Postcode:
  • *
  • Title:
  • *
  • Please enter your message content
  • *
     
WeChat
Weibo
No. 749, Dixiu Road, Binjiang Economic Development Zone, Jiangning, Nanjing, Jiangsu, China 9th Floor, Phoenix International Building, Gulou District, Nanjing, Jiangsu, China E-mail:hdjn@hdjn.com.cn  
E-mail:hdjn@hdjn.com.cn Fax:(+86) 025-83405596
Copyright ©2019 - 2020Nanjing Huadian Energy Saving and Environmental Protection Equipment Co., Ltd.
犀牛云提供企业云服务