Fangda Special Steel Pulverized Coal Injection

Date: 2019-02-26
Views: 103

Our company possesses strong engineering capabilities in blast furnace pulverized coal injection (PCI) system construction and enjoys an excellent reputation in the industry. Our completed PCI turnkey projects include the Fangda Special Steel Blast Furnace PCI Project and Huaxi Steel Blast Furnace PCI Project.

The adopted full bituminous coal PCI process achieves a coal injection rate of 200 kg per ton of iron.

The injection system features a parallel hopper configuration with dense-phase injection main pipes + furnace-front distributors, ensuring low power consumption while maintaining adaptability to continuous operation and dynamic coal injection rate adjustments in blast furnace production.

The system is equipped with automatic coal injection and automatic silo switching functions, enabling intelligent process control.

方大特钢喷煤

Case / Recommend
2019 - 02 - 26
Hit count: 103
Our company possesses strong engine...
2019 - 02 - 26
Hit count: 52
Recently, the waste heat boiler pro...
2019 - 02 - 26
Hit count: 72
Recently, Shougang Group achieved a...
2019 - 02 - 26
Hit count: 64
The Egang Riser Waste Heat Recovery...
Online message
Follow us
Contact us
  • Name
  • *
  • Company:
  • *
  • Address:
  • *
  • Telephone
  • *
  • Fax:
  • *
  • E-mail
  • *
  • Postcode:
  • *
  • Title:
  • *
  • Please enter your message content
  • *
     
WeChat
Weibo
No. 749, Dixiu Road, Binjiang Economic Development Zone, Jiangning, Nanjing, Jiangsu, China 9th Floor, Phoenix International Building, Gulou District, Nanjing, Jiangsu, China E-mail:hdjn@hdjn.com.cn  
E-mail:hdjn@hdjn.com.cn Fax:(+86) 025-83405596
Copyright ©2019 - 2020Nanjing Huadian Energy Saving and Environmental Protection Equipment Co., Ltd.
犀牛云提供企业云服务