Our company possesses strong engineering capabilities in blast furnace pulverized coal injection (PCI) system construction and enjoys an excellent reputation in the industry. Our completed PCI turnkey projects include the Fangda Special Steel Blast Furnace PCI Project and Huaxi Steel Blast Furnace PCI Project.
The adopted full bituminous coal PCI process achieves a coal injection rate of 200 kg per ton of iron.
The injection system features a parallel hopper configuration with dense-phase injection main pipes + furnace-front distributors, ensuring low power consumption while maintaining adaptability to continuous operation and dynamic coal injection rate adjustments in blast furnace production.
The system is equipped with automatic coal injection and automatic silo switching functions, enabling intelligent process control.