Egang Riser Project Successful Commissioning

Date: 2019-02-26
Views: 64

The Egang Riser Waste Heat Recovery Project, launched in 2022 at Echeng Steel’s Coking West Zone, overcame technical challenges in recovering high-temperature crude gas waste heat from coke ovens, achieving annual savings of 9,100 tons of standard coal and reducing CO₂ emissions by over 24,000 tons. Utilizing internationally leading thermal oil circulation technology, it efficiently captures 800°C waste gas, boosting steam output by 30% and generating annual economic benefits exceeding ¥10 million. Recognized as a Hubei Provincial Green Factory demonstration project, its modular design and intelligent control systems have been replicated by industry leaders like Baosteel and Maanshan Steel, empowering the sector’s low-carbon transition. The project also supports Ezhou City’s ecological governance and was listed as a provincial green and low-carbon, driving the steel industry’s contribution to China’s dual-carbon goals.

鄂钢上升管项目正常运行

Case / Recommend
2019 - 02 - 26
Hit count: 103
Our company possesses strong engine...
2019 - 02 - 26
Hit count: 52
Recently, the waste heat boiler pro...
2019 - 02 - 26
Hit count: 72
Recently, Shougang Group achieved a...
2019 - 02 - 26
Hit count: 64
The Egang Riser Waste Heat Recovery...
Online message
Follow us
Contact us
  • Name
  • *
  • Company:
  • *
  • Address:
  • *
  • Telephone
  • *
  • Fax:
  • *
  • E-mail
  • *
  • Postcode:
  • *
  • Title:
  • *
  • Please enter your message content
  • *
     
WeChat
Weibo
No. 749, Dixiu Road, Binjiang Economic Development Zone, Jiangning, Nanjing, Jiangsu, China 9th Floor, Phoenix International Building, Gulou District, Nanjing, Jiangsu, China E-mail:hdjn@hdjn.com.cn  
E-mail:hdjn@hdjn.com.cn Fax:(+86) 025-83405596
Copyright ©2019 - 2020Nanjing Huadian Energy Saving and Environmental Protection Equipment Co., Ltd.
犀牛云提供企业云服务